Durdyev, S and Mbachu, J (2011) On-site labour productivity of New Zealand construction industry: key constraints and improvement measures. Construction Economics and Building, 11(03), 18-33.

Formoso, T and Isatto, E L (2011) Three theoretical perspectives for understanding inter-firm coordination of construction project supply chains. Construction Economics and Building, 11(03), 1-17.

Ibem, E O, Anosike, M N, Azuh, D E and Mosaku, T (2011) Work stress among professionals in building construction industry in Nigeria. Construction Economics and Building, 11(03), 45-57.

Liu, J and London, K (2011) Analysing the relationship between new housing supply and residential construction costs with regional heterogeneities. Construction Economics and Building, 11(03), 58-67.

Ogbeifun, E (2011) Training artisans on-site. Construction Economics and Building, 11(03), 82-91.

  • Type: Journal Article
  • Keywords: Skilled artisans; on-site training; progressive construction processes; project stakeholders; contract documentation
  • ISBN/ISSN: 1837-9133
  • URL: https://doi.org/10.5130/AJCEB.v11i3.2234
  • Abstract:
    The decline in apprenticeship in both the public and private sectors, the increasing use of sub-contractors as well as the uncoordinated approach in the informal sector are contributing factors to the shortage of skilled artisans in the construction industry. Artisans training can be introduced and implemented through the adoption of progressive implementation of construction processes commencing work from areas requiring low skill demands to areas of high skill demand. The success of this principle hinges on the collaborative effort of the key project stakeholders. The client should be willing to absorb extra cost and delays in the project; the design and contract documentation should facilitate on-site training, and  the consultant actively guide the contractor and the construction processes to achieve the training objectives. The exploratory research method was adopted in this study and research revealed that this principle was used in a project in the UK and in the development of infrastructure in the tourism industry of South Africa .It is being recommended that the principle be adapted by the public sector for the development of small size infrastructures that can be repeated in many places. This will boost the quality and quantity of artisans, enhance employability, reduce rural urban migration and alleviate poverty

OO, B L, Abdul-Aziz, A-R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(03), 34-44.

Rose, M (2011) Can project alliance contracts deliver Australia’s National Broadband Network?. Construction Economics and Building, 11(03), 68-81.